⏱ Machine-wise Downtime (minutes per shift)▼ expand
📋 Shift-level Downtime Summary▼ expand
💬 Shift Remarks / Issues
Log machine-wise shift remarks and issues. Each entry links to a machine and shift.
No remarks. Click "+ Add Remark" to log shift issues.
↩ Re-Sort Entry — Machine-wise Reasons
Log machine-wise re-sort quantity and root cause. Target is always ZERO. Each entry links to a machine, shift, and defect reason.
No re-sort entries. Click "+ Add Re-Sort Entry" to log machine-wise re-sort reasons.
FLOORDATE
Production vs Target
Downtime by Category (minutes)
Downtime % per Department (max 1,440 min/day each)
Machine Efficiency %
Re-Sort by Root Cause
Machine-wise Summary
FLOOR
SCOPE
Daily Production Trend
DT% Trend
Efficiency % Trend
Re-Sort Trend
AIM vs Backlog (Produced − AIM = Backlog)
AIM vs Production — Machine Wise
FLOORDATE
Shift Incharge Scorecard
Incharge vs Efficiency — avg shift efficiency per incharge (rolling 30d)
👤 Operator-wise Performance
Loading...
🏭 Shift Personnel Performance
Loading...
🏭 Plant-wide Machine Production Report
Select a date to view the plant report.
All Saved Records
🔍 Search
Type to search across all DPR records...
📦 Closed Batches — Machine-wise
All closed batches with Planned vs Actual DPR Gross. Production Manager / Admin can correct an incorrect DPR gross here — the correction flows to Planning and Tracking Reports D & E.
Loading…
🔗 Server Sync Configuration
Checking server...
⚠️ Base URL only — e.g. https://sunloc.up.railway.app (no /dpr.html)
Once connected, all DPR saves automatically sync to the planning app. Active order dropdowns are populated from the planning app's current schedule.
Machine Targets (per shift)
Manpower Master
Add or remove team member names. Changes apply to all drop-down menus in data entry. Admin only.
Machine Management
Enable or disable machines per floor. Disabled machines are hidden from entry and analytics. Admin only.